OIG makes recommendations in our reports to improve the efficiency and effectiveness of agency programs and help agencies identify questioned costs and funds that could be put to better use. The aim is to spur our audited agencies to take corrective actions, which allow us to close the recommendations.

This dashboard identifies current open recommendations along with the associated questioned costs.  Open recommendations may be resolved or unresolved:

  • A recommendation is resolved when OIG agrees with the agency's plan of action.
  • A recommendation is unresolved when the agency has yet to share a plan of action or OIG disagrees with the plan.

The dashboard below may not reflect accurate numbers due to temporarily unavailable resources. We apologize for any inconvenience. Please check back soon.

 

Total Open Recommendations (As of 5/30/25)

343

Open Financial Recommendations (As of 5/30/25)

$56,304,556


Please see an updated list of recommendations with their corresponding report below.

2016

Sep 30, 2016
Audit Report
M-000-16-001-S
Recommendation
1

Recommendation 1. We recommend that the Millennium Challenge Corporation's Domestic and International Security Division, in coordination with the Office of the General Counsel, implement a corrective action plan that addresses the Office of Inspector General's review results and to strengthen the agency's classified national security information program and to achieve full compliance with Executive Order 13526 and Information Security Oversight Office regulations and directives.

Questioned Cost
0
Close Date
Aug 31, 2018
Sep 30, 2016
Audit Report
9-000-16-001-P
Recommendation
1

The Office of the Administrator implement a corrective action plan, described in Automated
Directives System 596, to bring USAID's Classified National Security Information Program into full compliance with Executive Order 13526 and Information Security Oversight Office regulations and directives.

Questioned Cost
0
Close Date
Mar 15, 2017
Sep 30, 2016
Audit Report
8-000-16-003-P
Recommendation
1

USAID/Egypt implement additional controls to make sure required data quality assessments are completed before submitting data in the annual performance plan and report.

Questioned Cost
0
Close Date
Sep 30, 2016
Recommendation
2

USAID/Jordan implement additional controls to make sure required data quality assessments are completed before submitting data in the annual performance plan and report.

Questioned Cost
0
Close Date
Sep 30, 2016
Recommendation
3

USAID/West Bank and Gaza implement additional controls to make sure required data quality assessments are completed before submitting data in the annual performance plan and report.

Questioned Cost
0
Close Date
Sep 30, 2016
Recommendation
4

USAID/Egypt's program office provide technical assistance to agreement officer's representatives and contracting officer's representatives on how to verify implementers’ data.

Questioned Cost
0
Close Date
Sep 30, 2016
Recommendation
5

USAID/Jordan's management implement a plan to reinforce sound methodologies with agreement officer's representatives and contracting officer's representatives for verifying implementers' data.

Questioned Cost
0
Close Date
Sep 30, 2016
Recommendation
6

USAID/West Bank and Gaza's management implement a plan to reinforce sound methodologies with agreement officer's representatives and contracting officer’s representatives for verifying implementers' data.

Questioned Cost
0
Close Date
Sep 30, 2016
Recommendation
7

USAID/Egypt's office directors implement a plan to make sure data quality assessments are complete.

Questioned Cost
0
Close Date
Aug 16, 2017
Recommendation
8

USAID/Jordan's office directors implement a plan to make sure data quality assessments are complete.

Questioned Cost
0
Close Date
Sep 30, 2016
Recommendation
9

USAID/West Bank and Gaza's office directors implement a plan to make sure data quality assessments are complete.

Questioned Cost
0
Close Date
Sep 30, 2016
Recommendation
10

USAID/Egypt, in coordination with its technical offices, implement a plan to strengthen controls over its databases to reduce errors in reporting.

Questioned Cost
0
Close Date
Aug 22, 2017
Recommendation
11

USAID/Egypt conduct an assessment with mission employees to find ways of improving Egypt Info for performance monitoring and reporting, and document an action plan with milestones to address the assessment's findings.

Questioned Cost
0
Close Date
Sep 20, 2017
Recommendation
12

USAID/Jordan, in coordination with its technical offices, implement a plan to strengthen controls over its databases to reduce errors in reporting.

Questioned Cost
0
Close Date
Sep 30, 2016
Recommendation
13

USAID/Jordan implement procedures to assess what agreement officer's representatives, contracting officer's representatives, and office directors need before the mission develops a new information management system for performance monitoring.

Questioned Cost
0
Close Date
Sep 30, 2016
Recommendation
14

USAID/West Bank and Gaza document an assessment and decision whether to hire an outside firm or other alternative to provide technical assistance for local nongovernmental organizations on USAID's requirements.

Questioned Cost
0
Close Date
Sep 30, 2016
Recommendation
15

USAID/West Bank and Gaza conduct an assessment with its staff and implementers to find ways of improving the Geo-Management Information System for performance monitoring and reporting, and document an action plan with timelines to address the assessment's findings.

Questioned Cost
0
Close Date
Sep 30, 2016
Recommendation
16

USAID/Egypt develop a mission-wide performance management plan.

Questioned Cost
0
Close Date
Aug 16, 2017
Recommendation
17

USAID/Jordan implement an action plan to make sure all activity and project performance management plan indicators feed into the mission performance management plan.

Questioned Cost
0
Close Date
Sep 30, 2016
Recommendation
18

USAID/West Bank and Gaza develop a mission-wide performance management plan.

Questioned Cost
0
Close Date
Apr 16, 2019
Recommendation
19

USAID/Egypt implement an action plan to make sure gender-sensitive indicators and sex-disaggregated data are incorporated in project design documents and activity performance management plans.

Questioned Cost
0
Close Date
Sep 30, 2016
Recommendation
20

USAID/Jordan implement an action plan to make sure sex-disaggregated data are incorporated in activity performance management plans.

Questioned Cost
0
Close Date
Sep 30, 2016
Recommendation
21

USAID/West Bank and Gaza implement an action plan to make sure sex-disaggregated data are incorporated in activity performance management plans.

Questioned Cost
0
Close Date
Sep 30, 2016
Recommendation
22

USAID/Egypt document the reallocation of budgeted funds to make sure enough money is dedicated to monitoring and evaluations.

Questioned Cost
0
Close Date
Jun 27, 2017
Recommendation
23

USAID/Jordan document the reallocation of budgeted funds to make sure enough money is dedicated to monitoring and evaluations.

Questioned Cost
0
Close Date
Sep 30, 2016
Recommendation
24

USAID/West Bank and Gaza document the reallocation of budgeted funds to make sure enough money is dedicated to monitoring and evaluations.

Questioned Cost
0
Close Date
Sep 30, 2016
Recommendation
25

USAID/West Bank and Gaza implement changes to its budgeting process to make sure the monitoring and evaluation point of contact has input on how monitoring and evaluation funds are allocated.

Questioned Cost
0
Close Date
Sep 30, 2016
Recommendation
26

USAID/Egypt implement additional tools (e.g., templates, standardized filing systems, handover checklists) that management deems appropriate for agreement officer's representatives and contracting officer's representatives to use when documenting and maintaining official files.

Questioned Cost
0
Close Date
Aug 22, 2017
Recommendation
27

USAID/Egypt's contracting and agreement office implement a plan to work with agreement officer's representatives and contracting officer's representatives to reinforce requirements for documenting site visit reports and maintaining official files.

Questioned Cost
0
Close Date
Aug 22, 2017
Recommendation
28

USAID/Jordan implement additional tools (e.g., templates, standardized filing systems, handover checklists) that management deems appropriate for agreement officer’s representatives and contracting officer's representatives to use when documenting and maintaining official files.

Questioned Cost
0
Close Date
Sep 30, 2016
Recommendation
29

'USAID/Jordan's contracting and agreement office implement a plan to work with agreement officer’s representatives and contracting officer's representatives to reinforce requirements for documenting site visit reports and maintaining official files.

Questioned Cost
0
Close Date
Sep 30, 2016
Recommendation
30

USAID/West Bank and Gaza's contracting and agreement office implement a plan to work with agreement officer's representatives and contracting officer's representatives to reinforce requirements for documenting site visit reports and maintaining official files.

Questioned Cost
0
Close Date
Sep 30, 2016
Recommendation
31

USAID/Egypt's office directors implement a plan to reinforce guidelines for agreement officer's representatives and contracting officer's representatives to conduct site visits to provide oversight according to the mission order on performance monitoring.

Questioned Cost
0
Close Date
Sep 30, 2016
Recommendation
32

USAID/Jordan's office directors implement a plan to reinforce guidelines for agreement officer's representatives and contracting officer's representatives to conduct monthly site visits to provide oversight according to the mission order on performance monitoring.

Questioned Cost
0
Close Date
Sep 30, 2016
Recommendation
33

USAID/West Bank and Gaza's office directors implement a plan to reinforce guidelines for agreement officer’s representatives and contracting officer's representatives to conduct site visits to provide oversight.

Questioned Cost
0
Close Date
Feb 14, 2017
Recommendation
34

USAID/Egypt's mission management document actions to make sure future portfolio reviews are conducted according to Automated Directives System 203.3.12.

Questioned Cost
0
Close Date
Sep 30, 2016
Recommendation
35

USAID/Egypt implement measures to confirm that implementers and agreement officer's representatives and contracting officer's representatives are informed of Development Experience Clearinghouse submission requirements.

Questioned Cost
0
Close Date
Sep 30, 2016
Recommendation
36

USAID/Jordan implement measures to confirm that implementers and agreement officer's representatives and contracting officer's representatives are informed of Development Experience Clearinghouse submission requirements.

Questioned Cost
0
Close Date
Sep 30, 2016
Recommendation
37

USAID/West Bank and Gaza implement measures to confirm that implementers and agreement officer's representatives and contracting officer's representatives are informed of Development Experience Clearinghouse submission requirements.

Questioned Cost
0
Close Date
Sep 30, 2016
Recommendation
38

USAID/West Bank and Gaza's contracting office implement a plan to confirm that contracting performance report requirements are met.

Questioned Cost
0
Close Date
Sep 30, 2016
Recommendation
39

USAID/Egypt implement a plan to make sure the evaluation point of contact's workload in the program office is adequate so all required evaluations are completed in a timely manner and reviewed for quality control.

Questioned Cost
0
Close Date
Sep 30, 2016
Recommendation
40

USAID/Egypt implement a training and technical assistance plan to make sure key mission staff working on evaluations have received initial or refresher training on evaluation management and methods.

Questioned Cost
0
Close Date
Sep 30, 2016
Recommendation
41

USAID/Jordan implement a plan to make sure the evaluation point of contact's workload in the program office is adequate so all required evaluations are completed in a timely manner and reviewed for quality control.

Questioned Cost
0
Close Date
Sep 30, 2016
Recommendation
42

USAID/Jordan implement and document a training and technical assistance plan to make sure key mission staff working on evaluations have received initial or refresher training on evaluation management and methods.

Questioned Cost
0
Close Date
Sep 30, 2016
Recommendation
43

USAID/West Bank and Gaza implement a plan to make sure the staffing levels and workloads of program office employees, including the evaluation point of contact, are adequate so all required evaluations are completed in a timely manner and reviewed for quality control.

Questioned Cost
0
Close Date
Sep 30, 2016
Recommendation
44

USAID/West Bank and Gaza implement and document a training and technical assistance plan to make sure key mission staff working on evaluations have received initial or refresher training on evaluation management and methods.

Questioned Cost
0
Close Date
Sep 30, 2016
Recommendation
45

USAID/Egypt implement an action plan to make sure project design documents address the evaluation policy planning requirements.

Questioned Cost
0
Close Date
Sep 30, 2016
Recommendation
46

USAID/Jordan complete and document its calculations of the average size of projects and include all required large projects in its inventory.

Questioned Cost
0
Close Date
Sep 30, 2016
Recommendation
47

USAID/Jordan implement an action plan to make sure project design documents address the evaluation policy planning requirements.

Questioned Cost
0
Close Date
Sep 30, 2016
Recommendation
48

USAID/West Bank and Gaza document its calculations of the average size of projects and include all required large projects in the mission's inventory and annual performance, plan, and report evaluation registry.

Questioned Cost
0
Close Date
Sep 30, 2016
Recommendation
49

USAID/West Bank and Gaza implement an action plan to make sure project design documents address the evaluation policy planning requirements.

Questioned Cost
0
Close Date
Sep 30, 2016
Recommendation
50

USAID/Egypt implement actions to make sure mission personnel complete a statement of work checklist or the equivalent before an evaluation is conducted.

Questioned Cost
0
Close Date
Sep 30, 2016
Recommendation
51

USAID/Jordan implement actions to make sure mission personnel complete a statement of work checklist or the equivalent before an evaluation is conducted.

Questioned Cost
0
Close Date
Sep 30, 2016
Recommendation
52

USAID/West Bank and Gaza implement actions to make sure mission personnel complete a statement of work checklist or the equivalent before an evaluation is conducted.

Questioned Cost
0
Close Date
Sep 30, 2016
Recommendation
53

USAID/Egypt implement a comprehensive plan to make sure draft reports for evaluations meet USAID's standards and minimum documentation requirements, and that management or program actions to address recommendations are documented.

Questioned Cost
0
Close Date
Sep 30, 2016
Recommendation
54

USAID/Jordan implement a comprehensive plan to make sure draft reports for evaluations meet USAID's standards and minimum documentation requirements, and that management or program actions to address recommendations are documented.

Questioned Cost
0
Close Date
Sep 30, 2016
Recommendation
55

USAID/West Bank and Gaza implement a plan to document management or program actions to address recommendations and maintain documentation in a central location.

Questioned Cost
0
Close Date
Sep 30, 2016
Sep 21, 2016
Audit Report
4-621-16-002-P
Recommendation
1

USAID/Tanzania implement a plan to validate beneficiaries' survey-based, self-reported data.

Questioned Cost
0
Close Date
Aug 22, 2017
Recommendation
2

USAID/Tanzania revise its Feed the Future performance indicators on distributing vitamin A to children under 5, on providing essential nutrition services, and on reaching women of reproductive age so that they portray outputs attained accurately.

Questioned Cost
0
Close Date
Sep 21, 2016
Recommendation
3

USAID/Tanzania establish a site visit policy that includes standards for frequency and documentation.

Questioned Cost
0
Close Date
Sep 21, 2016
Sep 13, 2016
Audit Report
1-523-16-007-P
Recommendation
1

USAID/Mexico require Abt Associates Inc. to update its monitoring and evaluation plan to include data sheets for all indicators, and update its work plan to match the monitoring and evaluation plan and comply with contract requirements.

Questioned Cost
0
Close Date
Sep 13, 2016
Recommendation
2

USAID/Mexico require Abt Associates Inc. to reflect the correct number of peopled trained in program reports and databases.

Questioned Cost
0
Close Date
Sep 13, 2016
Recommendation
3

USAID/Mexico require Abt Associates Inc., after updating the monitoring and evaluation plan, work plan, and reported results, to train staff on how to collect and report data.

Questioned Cost
0
Close Date
Sep 13, 2016
Recommendation
4

USAID/Mexico implement a fixed-fee payment schedule tied to the accomplishment of contract goals and indicator targets.

Questioned Cost
0
Close Date
Sep 13, 2016
Recommendation
5

USAID/Mexico determine the allowability of $366,212 in ineligible questioned costs related to the contractor's noncompliance with Federal Acquisition Regulation Part 13, and recover from Abt Associates Inc. the amount determined to be unallowable.

Questioned Cost
366212
Close Date
Nov 21, 2016
Recommendation
6

USAID/Mexico conduct a financial review of Abt Associates Inc. that includes an evaluation of compliance with Federal Acquisition Regulation Part 13, and make recommendations to improve compliance if warranted.

Questioned Cost
0
Close Date
Nov 21, 2016
Recommendation
7

USAID/Mexico implement a monitoring plan for its branding and marking requirements to make sure mission staff and implementers are complying.

Questioned Cost
0
Close Date
Nov 21, 2016
Recommendation
8

USAID/Mexico require Abt Associates Inc. to obtain approvals for using contractor and subcontractor logos and a waiver from using USAID's logo on all materials and Web sites developed and supported by the program, and establish an approval process with the mission for all future activities.

Questioned Cost
0
Close Date
Sep 13, 2016
Recommendation
9

USAID/Mexico provide written instructions to Abt Associates Inc. regarding branding and marking requirements and require Abt Associates Inc. to develop and implement a training plan for its staff and all subcontractors working on the program.

Questioned Cost
0
Close Date
Sep 13, 2016
Recommendation
10

USAID/Mexico determine the allowability of up to $1,738,912 in potential unsupported questioned costs related to the lack of appropriate monitoring and oversight for amounts expended by C230 Consultores S.C. and Instituto Mexicano para la Competitividad A.C., and recover from Abt Associates Inc. the amount determined to be unallowable.

Questioned Cost
0
Close Date
Nov 21, 2016
Sep 08, 2016
Audit Report
G-391-16-003-P
Recommendation
1

USAID/Pakistan develop a Pakistan strategy that complies with Automated Directives System 201.

Questioned Cost
0
Close Date
Jan 31, 2017
Recommendation
2

USAID's Bureau for Policy, Planning and Learning revise the Automated Directives System to clearly define USAID's roles and responsibilities for designing and implementing development when it is subject to State Department control in critical priority countries and provide alternate development strategies when a country development cooperation strategy or a transitional country strategy is not an option.

Questioned Cost
0
Close Date
Mar 23, 2017
Recommendation
3

USAID/Pakistan mission director prepare and provide to the USAID Administrator a plan to institute an interagency forum where USAID can better present its development perspective in critical priority countries, where the State Department takes the lead.

Questioned Cost
0
Close Date
Jan 30, 2017
Recommendation
4

USAID/Pakistan develop high-level indicator baselines and targets in its mission strategic framework.

Questioned Cost
0
Close Date
Feb 21, 2017
Recommendation
5

USAID/Pakistan's Office of Acquisition and Assistance implement guidance requiring risk assessments for potential local awardees, if no risk assessments were previously performed.

Questioned Cost
0
Close Date
Jan 31, 2017
Recommendation
6

USAID/Pakistan extends its award to Rural Support Programmes Network, the scope of work be reduced to overseeing the accounting firms' assessments, with the caveat that Rural Support Programmes Network review accounting firms' working papers for a random sample of assessment reports.

Questioned Cost
0
Close Date
Sep 08, 2016
Recommendation
7

USAID/Pakistan implement a plan for improving the delivery and measurement of capacity development under future awards.

Questioned Cost
0
Close Date
Jul 18, 2017
Recommendation
8

USAID/Pakistan develop policies and procedures to require that the exchange rate be established at the signing of the implementation letter as the exchange rate in effect at that date.

Questioned Cost
0
Close Date
Apr 26, 2017
Recommendation
9

USAID/Pakistan require the contracting officer's representative for the monitoring and evaluation contract provide a copy of Mission Order 200.2 to those following up on evaluation reports.

Questioned Cost
0
Close Date
Sep 08, 2016
Recommendation
10

USAID/Pakistan require contracting officer's representatives for the monitoring and evaluation contract to keep action plans for follow-up on evaluation findings and recommendations in their files and revise the file checklist to include these items.

Questioned Cost
0
Close Date
Jan 31, 2017
Recommendation
11

USAID/Pakistan require procurement officials to include cost realism checklists in the Agency Secure Image and Storage Tracking System for government-to-government awards, and periodically review for completeness the documentation supporting cost realism.

Questioned Cost
0
Close Date
Jan 30, 2017
Recommendation
12

USAID/Pakistan determine the amount of taxes it paid Pakistan and seek reimbursement from the Government of Pakistan or take steps to withhold the appropriate amount from future appropriations for assistance to Pakistan.

Questioned Cost
0
Close Date
Jan 30, 2017
Recommendation
13

USAID/Pakistan implement procedures for determining and tracking tax liability, seeking reimbursement from the Government of Pakistan for exempted taxes paid but not remitted, and taking steps for withholding unremitted taxes from future appropriations to Pakistan.

Questioned Cost
0
Close Date
Jan 30, 2017
Recommendation
14

USAID/Pakistan's Office of Acquisition and Assistance add to its procurement checklist a requirement to document in its files all sources and calculations that support independent government cost estimates.

Questioned Cost
0
Close Date
Jan 31, 2017
Recommendation
15

USAID/Pakistan's Office of Acquisition and Assistance establish a policy for verifying whether U.S. contractors bidding for cost-type contracts have adequate cost accounting and purchasing systems as part of the responsibility determination.

Questioned Cost
0
Close Date
Jan 31, 2017
Recommendation
16

USAID/Pakistan complete site visit templates and checklists in PakInfo and implement a plan for validating that all appropriate staff are aware of and use the templates.

Questioned Cost
0
Close Date
Jan 31, 2017
Recommendation
17

USAID/Pakistan add a requirement to agreement/contracting officer representatives' designation letters to complete reports within a specified time after completing site visits.

Questioned Cost
0
Close Date
Jul 18, 2017
Recommendation
18

USAID/Pakistan issue guidance describing the roles of provincial offices and activity managers and describing how provincial offices will receive funding commensurate with their responsibilities.

Questioned Cost
0
Close Date
Sep 19, 2017
Aug 10, 2016
Audit Report
4-687-16-001-P
Recommendation
1

The Bureau for Global Health's Office of Health, Infectious Diseases and Nutrition, Malaria Division in coordination with the responsible contracting officer, modify the active task order to require the contractor to provide insecticide inventories, expiration dates, and values before and after spraying for immediate management oversight.

Questioned Cost
0
Close Date
Nov 29, 2016
Recommendation
2

The Bureau for Global Health's Office of Health, Infectious Diseases and Nutrition, Malaria Division, in coordination with the responsible contracting officer, require the contractor to document its review of the project's warehouse procedures and inventories before, during, and after spray activities and provide information to USAID officials routinely.

Questioned Cost
0
Close Date
Nov 29, 2016
Recommendation
3

The Bureau for Global Health's Office of Health, Infectious Diseases and Nutrition, Malaria Division, in coordination with the responsible contracting officer, require the contractor to review its inventory process to identify deficiencies and implement corrective action.

Questioned Cost
0
Close Date
Feb 08, 2017
Recommendation
4

The Bureau for Global Health's Office of Health, Infectious Diseases and Nutrition, Malaria Division, in coordination with the responsible contracting officer, require the contractor to develop a commodities disposition plan to expedite relocation or disposal of expired or nearly expired insecticide products.

Questioned Cost
0
Close Date
Feb 08, 2017
Recommendation
5

USAID/Madagascar, in consultation with U.S. Embassy Antananarivo, its regional legal officer, and its regional contracting officer, implement written procedures to remind the Government of Madagascar periodically of its obligations to refund value-added taxes and the consequences of
noncompliance.

Questioned Cost
0
Close Date
Nov 29, 2016
Recommendation
6

USAID/Madagascar, in consultation with U.S. Embassy Antananarivo, its regional legal officer, and its regional contracting officer, implement a written process to address the Government of Madagascar's nonreimbursement of value-added taxes, and communicate the results to the
contractor for the African Indoor Residual Spraying Project.

Questioned Cost
0
Close Date
Nov 29, 2016
Recommendation
7

The Bureau for Global Health's Office of Health, Infectious Diseases and Nutrition, Malaria Division, require the contractor to update its environmental mitigation and monitoring plan to include mobile soak pits.

Questioned Cost
0
Close Date
Feb 08, 2017
Recommendation
8

The Bureau for Global Health's Office of Health, Infectious Diseases and Nutrition, Malaria Division, require the contractor to use the environmental mitigation and monitoring report format and certification form designed for indoor residual spraying activities by the 2013-2018 supplemental environmental assessment to comply with annual environmental reporting requisites.

Questioned Cost
0
Close Date
Aug 10, 2016
Recommendation
9

The Bureau for Global Health's Office of Health, Infectious Diseases and Nutrition, Malaria Division, require the contractor to identify the locations of mobile soak pits used in the past two spray campaigns, determine whether the pits have had any negative environmental impact, and document
the actions taken to mitigate any adverse effects of insecticide contaminants.

Questioned Cost
0
Close Date
Aug 10, 2016
Recommendation
10

Bureau for Global Health require the contracting officer representative to perform periodic reviews of documentation supporting expenditures for the Africa Indoor Residual Spraying Project.

Questioned Cost
0
Close Date
Feb 08, 2017
Jul 07, 2016
NFA Transmittal
3-000-16-052-T
Recommendation
1

USAID's Office of Acquisition and Assistance, Cost, Audit and Support determine the allowability of $1,262,423 in unsupported questioned costs and collect as appropriate any disallowed amounts from Africare.

Questioned Cost
1262423
Funds for Better Use
0
Close Date
Sep 23, 2021
Recommendation
2

USAID's Office of Acquisition and Assistance, Cost, Audit and Support follow up with Africare to ensure that it has implemented the auditor's recommendation for Findings 2015-001 through 2015-004, 2013-001, 2012-002, 2012-003, 2011-001 and 2011-004 (see pages 1-29 thru 1-38).

Questioned Cost
0
Close Date
May 23, 2018
Jul 06, 2016
Audit Report
1-521-16-006-P
Recommendation
1

USAID/Haiti work with the Haitian Government to implement a detailed sustainability plan that transfers the responsibility for paying the facilities' health workers from USAID to another source.

Questioned Cost
0
Close Date
Dec 29, 2017
Recommendation
2

USAID/Haiti evaluate and document its decision regarding Pathfinder International's request for additional funds and provide such funds only as part of a long-term sustainable approach to funding the project's health workers.

Questioned Cost
0
Close Date
Aug 23, 2016
Recommendation
3

USAID/Haiti clarify in writing to Pathfinder International its expectations on the work plan, performance management plan, and quality assurance surveillance plan, and approve these plans when they are completed.

Questioned Cost
0
Close Date
Jul 06, 2016
Recommendation
4

USAID/Haiti establish a schedule with deadlines for Pathfinder to bring performance data for the project in line with USAID's data quality standards and take corrective action if the deadlines are not met.

Questioned Cost
0
Close Date
Jul 06, 2016
Recommendation
5

USAID/Haiti instruct Pathfinder to provide each facility with written instructions on how to complete each field on the monthly form used to record health services delivered. The instructions should include common examples of what should and should not be reported.

Questioned Cost
0
Close Date
Aug 23, 2016
Recommendation
6

USAID/Haiti evaluate and document its conclusion regarding the proper classification of project health workers and set a deadline for Pathfinder to confirm that it complies with the Haitian Labor Code of 1984.

Questioned Cost
0
Close Date
Dec 14, 2017
Recommendation
7

USAID/Haiti, in coordination with the Haitian Government, implement a plan to close the gap in health worker compensation and mitigate the challenges of retaining staff in the health-care industry.

Questioned Cost
0
Close Date
Dec 29, 2017
Jul 05, 2016
Audit Report
8-000-16-002-P
Recommendation
1

USAID/Azerbaijan issue additional guidance, such as training materials and reporting templates, to clarify the allowability of and accounting for in-kind and cash contributions.

Questioned Cost
0
Close Date
Jul 05, 2016
Recommendation
2

USAID/Belarus issue additional guidance, such as training materials and reporting templates, to clarify the allowability of and accounting for in-kind and cash contributions.

Questioned Cost
0
Close Date
Jul 05, 2016
Recommendation
3

USAID/Ukraine issue additional guidance, such as training materials and reporting templates, to clarify the allowability of and accounting for in-kind and cash contributions.

Questioned Cost
0
Close Date
Jul 05, 2016
Recommendation
4

USAID/Azerbaijan issue an official notice, provide training, or update operating procedures to remind agreement officers about the Automated Directives System 303 requirement for cost-sharing memorandums.

Questioned Cost
0
Close Date
Jul 05, 2016
Recommendation
5

USAID/Belarus issue an official notice, provide training, or update operating procedures to remind agreement officers about the Automated Directives System 303 requirement for cost-sharing memorandums.

Questioned Cost
0
Close Date
Jul 05, 2016
Recommendation
6

USAID/Ukraine issue an official notice, provide training, or update operating procedures to remind agreement officers about the Automated Directives System 303 requirement for cost-sharing memorandums.

Questioned Cost
0
Close Date
Jul 05, 2016
Recommendation
7

The Bureau for Policy, Planning and Learning determine whether Automated Directives System 201 should include guidance on cost-sharing determination and design.

Questioned Cost
0
Close Date
Jul 05, 2016
Recommendation
8

The Bureau for Policy, Planning and Learning, in consultation with the Office of Acquisition and Assistance, develop supplemental guidance on cost-sharing determination and best practices.

Questioned Cost
0
Close Date
Dec 12, 2016
Recommendation
9

USAID/Azerbaijan implement procedures to confirm that USAID teams conduct a documented analysis in determining the amount of cost sharing to require.

Questioned Cost
0
Close Date
Oct 31, 2016
Recommendation
10

USAID/Belarus implement procedures to confirm that USAID teams conduct a documented analysis in determining the amount of cost sharing to require.

Questioned Cost
0
Close Date
Jul 05, 2016
Recommendation
11

USAID/Ukraine implement procedures to confirm that USAID teams conduct a documented analysis in determining the amount of cost sharing to require.

Questioned Cost
0
Close Date
Jul 05, 2016
Recommendation
12

The Bureau for Policy, Planning and Learning, in consultation with the Office of Acquisition and Assistance, analyze whether and how to allow USAID missions and field offices to provide input about their posts when cost-sharing amounts and requirements pertaining to worldwide grants are determined.

Questioned Cost
0
Close Date
Jul 05, 2016
Recommendation
13

USAID/Azerbaijan issue an official notice, provide training, or update operating procedures to remind agreement officer's representatives of their responsibility to monitor cost-sharing progress.

Questioned Cost
0
Close Date
Jul 05, 2016
Recommendation
14

USAID/Belarus issue an official notice, provide training, or update operating procedures to remind agreement officer's representatives of their responsibility to monitor cost-sharing progress.

Questioned Cost
0
Close Date
Jul 05, 2016
Recommendation
15

USAID/Ukraine issue an official notice, provide training, or update operating procedures to remind agreement officer's representatives of their responsibility to monitor cost-sharing progress.

Questioned Cost
0
Close Date
Jul 05, 2016
Recommendation
16

The Office of Human Capital and Talent Management modify training for agreement officer's representatives to expand discussion on the impacts of cost sharing and the responsibilities associated with monitoring its progress.

Questioned Cost
0
Close Date
Aug 27, 2018