Recommendation Dashboard

OIG makes recommendations in our reports to improve the efficiency and effectiveness of agency programs and help agencies identify questioned costs and funds that could be put to better use. The aim is to spur our audited agencies to take corrective actions, which allow us to close the recommendations.

This dashboard identifies current open recommendations along with the associated questioned costs.  Open recommendations may be resolved or unresolved:

  • A recommendation is resolved when OIG agrees with the agency's plan of action.
  • A recommendation is unresolved when the agency has yet to share a plan of action or OIG disagrees with the plan.

The dashboard below may not reflect accurate numbers due to temporarily unavailable resources. We apologize for any inconvenience. Please check back soon.

 

Total Open Recommendations (As of 4/15/25)

333

Open Financial Recommendations (As of 4/15/25)

$52,666,905


Please see an updated list of recommendations with their corresponding report below.

2015

Mar 12, 2015
Audit Report
A-000-15-006-P
Recommendation
1

The Chief Information Officer review the permissions within the Google Apps for business applications and revise any that are necessary to protect any personally identifiable information and sensitive but unclassified information from being shared improperly.

Questioned Cost
0
Close Date
Dec 29, 2017
Recommendation
2

The Chief Information Officer document and implement procedures to review permissions periodically within the Google Apps for business applications to identify and correct any improperly shared personally identifiable information and other sensitive information.

Questioned Cost
0
Close Date
Dec 29, 2017
Recommendation
3

The Chief Information Officer document and implement a training program for users of the Google Apps for business applications that includes awareness of the risks of disclosing sensitive information and preventive measures to avoid improper disclosure.

Questioned Cost
0
Close Date
Aug 12, 2016
Recommendation
4

The Chief Information Officer review and update the May 26, 2011, privacy impact assessment for Google Apps for business to reflect the types of information that the Google applications collect, maintain, and disseminate, and how the information is used.

Questioned Cost
0
Close Date
Dec 29, 2017
Recommendation
5

The Chief Information Officer document and implement a process for confirming that complete and detailed cost-benefit analyses are prepared for all proposed cloud computing service contracts and that investment documents, including cost estimates and validations, are maintained in accordance with Office of Management and Budget Circular A-130, the Federal Acquisition Regulation Subpart 39, and Automated Directives System 577.

Questioned Cost
0
Close Date
Jun 30, 2016
Recommendation
6

the Chief Information Officer document and implement a process for confirming that all documents supporting post-implementation reviews of cloud computing service contracts are maintained as required in Automated Directives System 577.

Questioned Cost
0
Close Date
Jun 30, 2016
Recommendation
7

The Chief Information Officer update USAID's inventory of cloud computing contracts so the inventory list is complete.

Questioned Cost
0
Close Date
Aug 12, 2016
Recommendation
8

The Chief Information Officer document and implement procedures for maintaining a complete, accurate inventory of the Agency's cloud computing contracts.

Questioned Cost
0
Close Date
Aug 12, 2016
Recommendation
9

The Director, Office of Acquisition and Assistance, document and implement acquisition policies and procedures to comply with the IT Project Governance Manual, and require USAID missions, bureaus, and offices to get the Chief Information Officer's approval before acquiring and using cloud computing services.

Questioned Cost
0
Close Date
Mar 31, 2016
Recommendation
10

The Director, Office of Acquisition and Assistance, develop and establish cloud service contracting requirements in accordance with the best practices for the following items: terms of service, service level agreements, nondisclosure agreements, and investigative access.

Questioned Cost
0
Close Date
Aug 16, 2016
Recommendation
11

The Chief Information Officer modify USAID contract no. AID-CIO-O-13-00054 with MiCore Solutions Inc. for Google Apps for business to include: terms of service and assign a USAID official to monitor USAID's compliance with the terms.A service level agreement that addresses scheduled service outages, data
preservation responsibilities, and service agreement change. A signed nondisclosure agreement by the cloud service provider. A requirement for investigative access in accordance with best practices.

Questioned Cost
0
Close Date
Sep 22, 2016
Recommendation
12

The Chief Information Officer modify USAID contract no. AID-CIO-M-11-00008 with Terremark Federal Group Inc. for Terremark Services to include:an assigned USAID official to monitor USAID's compliance with the terms of service. An executed service level agreement with the cloud service provider that addresses remedies to be paid when services are not available. A signed nondisclosure agreement by the cloud service provider. A requirement for investigative access in accordance with best practices.

Questioned Cost
0
Close Date
Sep 22, 2016
Recommendation
13

The Chief Information Officer modify USAID contract no. AID-CTA-TO-13-00001/2 with Triad Technology Partners Inc. and Immix Technology Inc. for the Intranet Modernization Initiative to include:terms of service and assign a USAID official to monitor USAID's compliance with the terms. An executed service level agreement with the cloud service provider that addresses schedule service outages, data preservation responsibilities, service agreement changes, and remedies to be paid when services are not available. A signed nondisclosure agreement by the cloud service provider. A requirement for investigative access in accordance with best practices.

Questioned Cost
0
Close Date
Sep 22, 2016
Recommendation
14

The Chief Information Officer establish or revise target dates in Google Apps for business's plan of action and milestones for action items that do not have a due date or are past-due.

Questioned Cost
0
Close Date
Feb 20, 2018
Recommendation
15

The Chief Information Officer modify the contract for Google Apps for business to require that the cloud service provider be certified by the Federal Risk and Authorization Management Program, or move the service to a certified provider.

Questioned Cost
0
Close Date
Aug 22, 2017
Recommendation
16

The Chief Information Officer complete the Federal Risk and Authorization Management Program Agency Authorization for Huddle and Tibbr for the Intranet Modernization Initiative by September 30, 2015, per the contract.

Questioned Cost
0
Close Date
Sep 29, 2016
Recommendation
17

The Chief Information Officer assess and authorize security controls for Salesforce's CRM cloud-based system.

Questioned Cost
0
Close Date
Jul 19, 2017
Recommendation
18

The Chief Information Officer update the Frequency of Reviews column in Automated Directives System, Chapter 577, Table 1 -Investment Funding Category Documentation and Review Requirements, by requiring post-implementation reviews for Investment Funding Category I and II as required by the Office of Management and Budget Circular A-130.

Questioned Cost
0
Close Date
Aug 12, 2016
Feb 25, 2015
Audit Report
9-111-15-002-P
Recommendation
1

USAID/Armenia implement controls to incorporate lessons learned and concept paper review comments into project design.

Questioned Cost
0
Close Date
Sep 04, 2015
Recommendation
2

USAID/Armenia document how the Clean Energy and Water Project is aligned with the country development cooperation strategy.

Questioned Cost
0
Close Date
Feb 25, 2015
Recommendation
3

USAID/Armenia implement written procedures to document technical direction provided by the contracting officer's representative and give the directions to the contracting officer.

Questioned Cost
0
Close Date
Sep 04, 2015
Recommendation
4

USAID/Armenia discuss and document the need for a Clean Energy and Water Project contract modification with the contracting officer and the contractor, and modify if needed.

Questioned Cost
0
Close Date
Feb 25, 2015
Recommendation
5

USAID/Armenia develop and implement procedures to factor sustainability into project planning.

Questioned Cost
0
Close Date
Feb 25, 2015
Recommendation
6

USAID/Armenia assess and document the Armenian Government's capacity and implement a sustainability plan for the Clean Energy and Water Project activities.

Questioned Cost
0
Close Date
Feb 25, 2015
Recommendation
7

USAID/Armenia, in coordination with donors and others as necessary, determine the need for activities identified as potentially duplicative and document the results of the determination and coordination.

Questioned Cost
0
Close Date
Feb 25, 2015
Recommendation
8

USAID/Armenia provide clarification on the contracting officer representative's approval of the implementing partner's documents, and train contracting officer representatives on the level of technical, administrative, and financial oversight they should provide to implementers.

Questioned Cost
0
Close Date
Feb 25, 2015
Recommendation
9

USAID/Armenia require the contractor to provide detailed subcontractors' vouchers that have budget lines for costs such as salaries, allowances, and other direct costs.

Questioned Cost
0
Close Date
Feb 25, 2015
Recommendation
10

USAID/Armenia provide missing rate approvals for implementing partner staff.

Questioned Cost
0
Close Date
Feb 25, 2015
Recommendation
11

USAID/Armenia determine the amount of salaries billed, the allowability of $131,235 in unsupported salaries paid, and collect any deemed unallowable.

Questioned Cost
131235
Close Date
Aug 28, 2015
Recommendation
12

USAID/Armenia implement controls for identifying and reconciling budgeted versus actual project costs.

Questioned Cost
0
Close Date
Sep 04, 2015
Recommendation
13

USAID/Armenia implement and document internal controls to make sure project management files maintain the minimum amount of documentation, in accordance with the designation letter. These files should be accessible and have adequate documentation for audit purposes and future contracting officers' representatives.

Questioned Cost
0
Close Date
Feb 25, 2015
Recommendation
14

USAID/Armenia collaborate with the implementing partner to update the performance management plan to ensure validity, integrity, precision, and reliability of data, and document the results.

Questioned Cost
0
Close Date
Sep 04, 2015
Recommendation
15

USAID/Armenia implement a plan to improve oversight and verification of the implementing partner's reported performance results.

Questioned Cost
0
Close Date
Sep 04, 2015
Recommendation
16

USAID/Armenia determine the amount spent on energy, and discuss energy-related project priorities with the Bureau for Economic Growth, Education, and Environment's Energy and Infrastructure Office, take any related corrective actions, and document the discussion and results.

Questioned Cost
0
Close Date
Feb 25, 2015
Feb 24, 2015
Audit Report
4-696-15-002-P
Recommendation
1

USAID/Rwanda modify the Family Health Project contract to establish binding performance standards.

Questioned Cost
0
Close Date
Feb 24, 2015
Recommendation
2

USAID/Rwanda require Chemonics International Inc. to provide quarterly progress reports that include quantitative and sex-disaggregated performance management plan data.

Questioned Cost
0
Close Date
Aug 28, 2015
Recommendation
3

USAID/Rwanda implement a system to track and document mission follow-up on issues and recommendations reported in data quality assessments.

Questioned Cost
0
Close Date
Sep 09, 2015
Recommendation
4

USAID/Rwanda update its standard site visit checklist to reflect the site visit data verification steps required by the mission order.

Questioned Cost
0
Close Date
Sep 09, 2015
Feb 23, 2015
Audit Report
5-367-15-003-P
Recommendation
1

USAID/Nepal work with World Wildlife Fund to increase the final target for Hectares of biodiverse area under improved management to reflect an ambitious, achievable result expected under the Hariyo Ban Program.

Questioned Cost
0
Close Date
Feb 23, 2015
Recommendation
2

USAID/Nepal work with World Wildlife Fund to create standard reporting procedures for program income earned under the Hariyo Ban Program.

Questioned Cost
0
Close Date
Aug 31, 2015
Recommendation
3

USAID/Nepal work with World Wildlife Fund to develop new guidance for cooperatives receiving revolving funds, including requirements to use funds in a timely manner and limit administrative expenses.

Questioned Cost
0
Close Date
Aug 31, 2015
Recommendation
4

USAID/Nepal require the World Wildlife Fund to set performance targets or milestones for activities funded by Windows of Opportunity grants to gauge how successful they are in contributing to the Hariyo Ban Program's objectives.

Questioned Cost
0
Close Date
Feb 23, 2015
Recommendation
5

USAID/Nepal require World Wildlife Fund to contract audits of its subrecipients Federation of Community Forest Users Nepal and National Trust for Nature Conservation for the fiscal years ending June 2013 and June 2014, and verify that an audit is completed for every subrecipient spending more than $300,000 in one fiscal year. The audits should be conducted in accordance with the Guidelines for Financial Audits Contracted by Foreign Recipients, dated February 2009.

Questioned Cost
0
Close Date
Aug 31, 2015
Feb 20, 2015
Audit Report
9-000-15-001-P
Recommendation
1

USAID's Bureau for Policy, Planning, and Learning, as part of its next planned country development cooperation strategy policy revision, survey relevant Washington and mission staff to find ways to streamline the process to address these issues, and make sure these changes are written into the updated policy.

Questioned Cost
0
Close Date
Jan 24, 2017
Recommendation
2

USAID's Bureau for Policy, Planning, and Learning work with relevant Washington staff to develop a written process and plan for reviewing and commenting on country development cooperation strategies, and set deadlines for getting feedback.

Questioned Cost
0
Close Date
Jan 24, 2017
Recommendation
3

USAID's Bureau for Policy, Planning, and Learning define, track, and update regularly the complete list of USAID countries and regional missions and maintain a list of those granted exemptions from having country development cooperation strategies.

Questioned Cost
0
Close Date
Dec 15, 2015
Recommendation
4

USAID's Bureau for Policy, Planning, and Learning revise policy to include documentation required to exempt a mission from having a country development cooperation strategy, as well as verification, approval, and tracking procedures.

Questioned Cost
0
Close Date
Jan 24, 2017
Recommendation
5

USAID's Bureau for Policy, Planning, and Learning coordinate with the Administrator and Office of Budget Resources and Management to determine how to increase the focus on local priorities considering budgetary constraints, and document the results.

Questioned Cost
0
Close Date
Jan 24, 2017
Recommendation
6

USAID's Bureau for Policy, Planning, and Learning revise policy to clarify how local priorities and budget are weighted and to what extent the country development cooperation strategy should reflect these needs, and include guidance on increasing focus on local priorities, as needed, based on its coordination efforts with the Administrator and Office of Budget Resources and Management.

Questioned Cost
0
Close Date
Jan 24, 2017
Feb 20, 2015
Audit Report
4-611-15-001-P
Recommendation
1

USAID/Zambia implement a coordination strategy for its HIV program to help implementers avoid duplicating activities.

Questioned Cost
0
Close Date
Sep 23, 2015
Recommendation
2

USAID/Zambia review the implementation strategy of its Partnership for Integrated Social Marketing Project and make changes to its community-based distribution program.

Questioned Cost
0
Close Date
Feb 20, 2015
Recommendation
3

USAID/Zambia analyze the competing demands on contracting officer's representatives' time and implement solutions to make sure it has sufficient resources to perform fundamental oversight tasks.

Questioned Cost
0
Close Date
Feb 20, 2015
Recommendation
4

USAID/Zambia require its contracting officer's representatives to complete USAID's records management training course and update project files to include the required documents.

Questioned Cost
0
Close Date
Sep 23, 2015
Recommendation
5

USAID/Zambia, in collaboration with Population Services International, implement procedures to improve the tracking of HIV commodities, which includes using stock cards for all commodities stored in its warehouses.

Questioned Cost
0
Close Date
Feb 20, 2015
Recommendation
6

USAID/Zambia, in collaboration with Population Services International, implement cost-effective procedures to address the environmental hazards at its central warehouse in Lusaka.

Questioned Cost
0
Close Date
Feb 20, 2015
Recommendation
7

USAID/Zambia, in collaboration with Population Services International, implement procedures to improve the legibility of lot numbers and expiration dates stamped on commodities.

Questioned Cost
0
Close Date
Feb 20, 2015
Feb 19, 2015
Audit Report
1-527-15-005-P
Recommendation
1

USAID/Peru adjust its ProDecentralization Project's remaining work plans to include a civil service law awareness campaign and provide technical assistance on how to implement the law.

Questioned Cost
0
Close Date
Feb 19, 2015
Recommendation
2

USAID/Peru incorporate private sector involvement into the ProDecentralization activities and track them accordingly.

Questioned Cost
0
Close Date
Feb 19, 2015
Feb 10, 2015
Audit Report
A-000-15-005-P
Recommendation
1

USAID's Chief Financial Officer either configure webTA so it prevents employees and supervisors from validating and certifying timesheets that include premium pay hours that have not been submitted and approved in accordance with webTA procedures and document the results or document the acceptance of the risk of not doing so.

Questioned Cost
0
Close Date
Aug 22, 2017
Recommendation
2

USAID's Chief Financial Officer conduct a documented review of the 151 pay provider validation rules in webTA; make a written
determination on which rules apply to Agency operations, and based on that, document an approved webTA baseline set of controls.

Questioned Cost
0
Close Date
Dec 31, 2015
Recommendation
3

USAID's Chief Information Officer, through the cognizant contracting officer, modify the written webTA contract to require the webTA vendor to provide detailed explanations of each pay provider validation rule, including the impact of each on the submission and approval of requests and the validation and approval of timesheets.

Questioned Cost
0
Close Date
Mar 31, 2016
Recommendation
4

USAID's Chief Financial Officer coordinate with the Chief Human Capital Officer and the Chief Information Officer to designate in writing a responsible office for developing and enforcing premium pay policies and procedures, and update USAID's Automated Directives System 472 and 626, including mandatory internal references, accordingly.

Questioned Cost
0
Close Date
Aug 22, 2017
Feb 04, 2015
Audit Report
7-681-15-004-P
Recommendation
1

USAID/Cote d'Ivoire, in coordination with USAID/West Africa's Regional Assistance and Acquisition Office, sign Modification 3 after verifying that it includes updated plans and a revised budget for construction activities.

Questioned Cost
0
Close Date
Feb 04, 2015
Recommendation
2

USAID/Cote d'Ivoire document its intention to award the American Institutes for Research a no-cost extension to allow sufficient time to complete planned construction activities. If approved, the extension should require the American Institutes for Research to develop and implement a mission-approved schedule for construction.

Questioned Cost
0
Close Date
Feb 04, 2015
Recommendation
3

USAID/Cote d'Ivoire, in coordination with the American Institutes for Research and the Ministry of Education, implement a memorandum of understanding to establish roles and responsibilities that aligns with the cooperative agreement.

Questioned Cost
0
Close Date
Feb 04, 2015
Recommendation
4

USAID/Cote d'Ivoire, in coordination with USAID/West Africa's Regional Financial Management Office, review and document program disbursements as of June 30, 2014, and confirm that the implementer used funds appropriately.

Questioned Cost
0
Close Date
Feb 04, 2015
Recommendation
5

USAID/Cote d'Ivoire train its staff to use PhoenixViewer to monitor payments to the implementer.

Questioned Cost
0
Close Date
Jul 20, 2015
Recommendation
6

USAID/Cote d'Ivoire implement procedures to provide financial oversight of the program. These procedures should include verifying that the American Institutes for Research submits quarterly federal financial reports as required and that the agreement officer's representative compares these reports to the Agency's online financial reporting system.

Questioned Cost
0
Close Date
Jul 20, 2015
Jan 30, 2015
Audit Report
1-514-15-004-P
Recommendation
1

USAID/Colombia document and implement a plan of action, with milestones, for the remainder of the program, to address the land titling plans that were submitted to the Colombian Government for approval.

Questioned Cost
0
Close Date
Feb 02, 2016
Recommendation
2

USAID/Colombia determine the allowability of
$2,086,829 in ineligible questioned costs for subawards that were not competed, and recover from ACDI/VOCA any amounts deemed unallowable.

Questioned Cost
2086829
Close Date
Mar 09, 2015
Recommendation
3

USAID/Colombia review all subawards issued by the Afro-Colombian and Indigenous Program that were awarded without competition and determine whether an adequate justification for exception to competition exists, take remedial action, including recovering any costs deemed unallowable, and document the results.

Questioned Cost
0
Close Date
Feb 02, 2016
Recommendation
4

USAID/Colombia issue a written notice to ACDI/VOCA of its responsibilities related to competition, and document any exceptions to competition.

Questioned Cost
0
Close Date
Jan 30, 2015
Recommendation
5

USAID/Colombia instruct ACDI/VOCA in writing to provide proper documentation supporting training lasting more than 1 day to USAID.

Questioned Cost
0
Close Date
Jan 30, 2015
Recommendation
6

USAID/Colombia determine whether the midterm evaluation should be conducted as planned, make changes if appropriate, and document the results.

Questioned Cost
0
Close Date
Jan 30, 2015