Recommendation Dashboard

OIG makes recommendations in our reports to improve the efficiency and effectiveness of agency programs and help agencies identify questioned costs and funds that could be put to better use. The aim is to spur our audited agencies to take corrective actions, which allow us to close the recommendations.

This dashboard identifies current open recommendations along with the associated questioned costs.  Open recommendations may be resolved or unresolved:

  • A recommendation is resolved when OIG agrees with the agency's plan of action.
  • A recommendation is unresolved when the agency has yet to share a plan of action or OIG disagrees with the plan.

The dashboard below may not reflect accurate numbers due to temporarily unavailable resources. We apologize for any inconvenience. Please check back soon.

 

Total Open Recommendations (As of 3/6/25)

308

Open Financial Recommendations (As of 3/6/25)

$52,182,754


Please see an updated list of recommendations with their corresponding report below.

2012

Nov 13, 2011
Audit Report
F-306-12-001-P
Recommendation
1

USAID/Office of Transition Initiatives direct Chemonics to develop detailed work plans for program implementation based on the district stability framework and determine the adequacy of these plans.

Questioned Cost
0
Close Date
May 18, 2012
Recommendation
2

USAID/Office of Transition Initiatives develop objective standards for evaluating Chemonics' performance, including standards for timeliness of program implementation.

Questioned Cost
0
Close Date
May 31, 2012
Recommendation
3

USAID/Office of Transition Initiatives develop formal communication protocols to facilitate interaction and communication between USAID/Office of Transition Initiatives managers and Chemonics.

Questioned Cost
0
Close Date
Nov 13, 2011
Recommendation
4

USAID/Office of Transition Initiatives prepare activity manager designation letters describing field program manager responsibilities.

Questioned Cost
0
Close Date
May 31, 2012
Recommendation
5

USAID/Office of Transition Initiatives provide training for its field program managers on their roles and responsibilities and program implementation practices and procedures.

Questioned Cost
0
Close Date
May 31, 2012
Recommendation
6

USAID/Office of Transition Initiatives instruct Chemonics to adjust its program grants portfolio to include more small-scale activities.

Questioned Cost
0
Close Date
May 31, 2012
Recommendation
7

USAID/Office of Transition Initiatives formally delegate contracting officer's technical representative responsibilities for directing Chemonics to the USAID/Office of Transition Initiatives Regional Representative in Kandahar.

Questioned Cost
0
Close Date
May 31, 2012
Recommendation
8

USAID/Office of Transition Initiatives implement budgetary controls at the district level to manage existing and future grants.

Questioned Cost
0
Close Date
Nov 13, 2011
Recommendation
9

USAID/Office of Transition Initiatives recover as appropriate the $12,200 spent for supporting other agencies under the ASI-SR program.

Questioned Cost
12200
Close Date
Mar 26, 2012
Recommendation
10

USAID/Office of Transition Initiatives develop and implement benchmarks to assess Chemonics' progress in closing out completed grants.

Questioned Cost
0
Close Date
May 31, 2012
Recommendation
11

USAID/Office of Transition Initiatives issue written guidance to Chemonics describing time frames for project closeout.

Questioned Cost
0
Close Date
May 31, 2012
Recommendation
12

USAID/Office of Transition Initiatives direct Chemonics to assist Afghan Government officials in developing a local branding plan.

Questioned Cost
0
Close Date
May 31, 2012
Recommendation
13

USAID/Afghanistan 1) identify the districts in which it intends to implement post-transition development projects, 2) develop transition plans for districts in which it plans to implement future projects, and 3) closeout plans for districts where it will not implement new projects.

Questioned Cost
0
Close Date
Mar 29, 2013
Recommendation
14

USAID/Office of Transition Initiatives determine the allowability of $6.5 million in security costs and recover costs determined to be unallowable.

Questioned Cost
4846842
Close Date
May 17, 2012
Recommendation
15

USAID/Office of Transition Initiatives instruct Chemonics to develop compensating controls for use in conjunction with cash payments.

Questioned Cost
0
Close Date
May 31, 2012
Recommendation
16

USAID/Office of Transition Initiatives instruct Chemonics to report actual results in its progress reports.

Questioned Cost
0
Close Date
Nov 13, 2011
Recommendation
17

USAID/Office of Transition Initiatives develop procedures for validating reported results on a periodic basis.

Questioned Cost
0
Close Date
May 31, 2012
Recommendation
18

USAID/Office of Transition Initiatives complete all required contractor performance reviews under the Afghanistan Stabilization Initiative for the Southern Region contract.

Questioned Cost
0
Close Date
May 31, 2012
Nov 10, 2011
Audit Report
4-615-12-002-P
Recommendation
1

USAID/Kenya require Family Health International to implement a reporting system that is sufficient to track and report on activities for an entire fiscal year.

Questioned Cost
0
Close Date
Sep 13, 2012
Recommendation
2

USAID/Kenya work with Family Health International to develop and implement a timeline to correct its reporting system to classify activities into the six core areas defined by guidance from the Office of the U.S. Global AIDS Coordinator.

Questioned Cost
0
Close Date
Sep 13, 2012
Recommendation
3

USAID/Kenya develop and implement a plan that requires Family Health International to provide services to and report on only those orphans and other vulnerable children that meet the definition in the President's Emergency Plan for AIDS Relief guidance.

Questioned Cost
0
Close Date
Sep 13, 2012
Recommendation
4

USAID/Kenya modify its data quality assessment procedures to include a review of how results are compiled and reported by implementing partners.

Questioned Cost
0
Close Date
Sep 13, 2012
Recommendation
5

USAID/Kenya develop and implement a method to track by program area the expenditure of funds from the President's Emergency Plan for AIDS Relief.

Questioned Cost
0
Close Date
Sep 13, 2012
Oct 28, 2011
Audit Report
5-119-12-001-P
Recommendation
1

USAID/Central Asian Republics establish additional output indicators to measure achievements under the voucher activity, including the number of voucher recipients and the number of vouchers redeemed.

Questioned Cost
0
Close Date
Mar 27, 2013
Recommendation
2

USAID/Central Asian Republics adopt and document end-of-program targets, as well as milestone targets, for all output indicators as required by Automated Directives System 203.3.3.1.b.

Questioned Cost
0
Close Date
Jul 19, 2013
Recommendation
3

USAID/Central Asian Republics implement control procedures to require that the contractor supports reported achievements with reliable documentation, the contractor enters information accurately into the program's database, and reported results accurately reflect the intended measurement of the indicators (people trained, not training courses provided).

Questioned Cost
0
Close Date
Mar 27, 2013
Recommendation
4

USAID/Central Asian Republics modify the voucher activity as necessary to communicate the purpose of the voucher activity more effectively.

Questioned Cost
0
Close Date
Mar 27, 2013
Recommendation
5

USAID/Central Asian Republics clarify the Productive Agriculture Program's farmer eligibility requirements with its contractor. The contractor should then communicate in writing the requirements to personnel implementing and monitoring the voucher activity so that they select only eligible individuals to participate.

Questioned Cost
0
Close Date
Mar 27, 2013
Recommendation
6

USAID/Central Asian Republics identify the key dates by which farmers need voucher inputs for various crops and implement a schedule for delivering inputs well in advance of those dates, giving farmers sufficient time to save or identify financing for purchasing these inputs.

Questioned Cost
0
Close Date
Mar 27, 2013
Recommendation
7

USAID/Central Asian Republics expedite the program's approval process for grant applications.

Questioned Cost
0
Close Date
Mar 27, 2013
Recommendation
8

USAID/Central Asian Republics implement a plan to facilitate purchases of agricultural equipment through more frequent purchase requests to the contracting officer and expedited approval.

Questioned Cost
0
Close Date
Mar 27, 2013
Oct 26, 2011
Audit Report
2-000-12-001-S
Recommendation
1

The Office of Management Services update USAID's conference policy to cross-reference the Federal Travel Regulation, Part 301--74 and Chapter 301, Appendixes C and E.

Questioned Cost
0
Close Date
May 17, 2012
Recommendation
2

The Office of the Chief Operating Officer update all USAID conference-related guidance to reflect the Federal Travel Regulation, Part 301--74 and Chapter 301, Appendixes C and E, and ensure that staff members are trained accordingly.

Questioned Cost
0
Close Date
May 17, 2012
Recommendation
3

The Office of the Chief Operating Officer notify offices and missions that total conference cost estimates must reflect the total cost to the Agency, and establish controls to enforce this requirement.

Questioned Cost
0
Close Date
Mar 16, 2012
Recommendation
4

The Chief Operating Officer institute controls which require his approval before conference-related costs may be included in USAID-funded awards.

Questioned Cost
0
Close Date
Mar 15, 2013
Recommendation
5

The Office of the Chief Operating Officer adjust its conference reporting requirements to solicit Agency-wide information.

Questioned Cost
0
Close Date
May 17, 2012
Recommendation
6

The Office of the Chief Operating Officer implement a rolling conference approval process, and include a limitation on late registration in the updated conference guidance.

Questioned Cost
0
Close Date
May 17, 2012
Recommendation
7

The Office of the Chief Operating Officer include in its updated conference guidance a requirement that cost estimates include a government facility among possible venues and that planners consider alternatives such as teleconferencing.

Questioned Cost
0
Close Date
Mar 16, 2012
Recommendation
8

The Office of the Chief Operating Officer require written justification when a commercial facility is selected over a government facility offered at a cheaper rate.

Questioned Cost
0
Close Date
Mar 16, 2012
Recommendation
9

The Office of Management Services hold a refresher course for travel arrangers, voucher examiners, and travelers on the current methods for calculating per diem.

Questioned Cost
0
Close Date
Mar 16, 2012
Recommendation
10

The Office of the Chief Financial Officer recover the $90 overpayment made to a staff member who received reimbursement using the all-inclusive method (listed in Appendix III).

Questioned Cost
0
Close Date
Jun 08, 2012
Recommendation
11

The Office of the Chief Operating Officer require, as part of the approval process for a conference serving meals to local staff, that the approving official provide a written determination that provision of the meals is necessary for the employee to obtain the full benefit of the training.

Questioned Cost
0
Close Date
Mar 16, 2012
Recommendation
12

The Office of the Chief Operating Officer specify in its updated conference guidance that USAID conference attendees must declare all provided meals on their travel voucher.

Questioned Cost
0
Close Date
Mar 16, 2012
Recommendation
13

The Office of Management Services develop controls for travel arrangers and voucher examiners to recognize and avoid duplicated payments for furnished meals for staff on travel duty.

Questioned Cost
0
Close Date
Mar 16, 2012
Recommendation
14

The Office of the Chief Financial Officer recover $4,890 in overpayments for meals furnished to staff at the conferences reviewed (listed in Appendix III).

Questioned Cost
0
Close Date
Jun 08, 2012
Oct 13, 2011
Audit Report
1-521-12-001-P
Recommendation
1

USAID/Haiti require Population Services International to identify the quantity of training material that it anticipates it will need for the last year of the contract, and either fulfill these needs with the available educational material in stock or place orders to print new materials.

Questioned Cost
0
Close Date
Sep 17, 2012
Recommendation
2

USAID/Haiti require Population Services International to commit and follow through with the delivery of a marketing and communication plan for HIV, as well as the promised radio soap opera.

Questioned Cost
0
Close Date
Sep 17, 2012
Recommendation
3

USAID/Haiti require Population Services International to establish consistent definitions and practices of how its subcontractors are to track and report the activity against the training and outreach indicators.

Questioned Cost
0
Close Date
Sep 17, 2012
Recommendation
4

USAID/Haiti require Population Services International to develop and utilize sales data collection tools that will provide consistent and accurate data.

Questioned Cost
0
Close Date
Sep 17, 2012
Recommendation
5

USAID/Haiti request that Population Services International implement the sales and marketing activity data collection efforts as stipulated in the contract and use the resulting data to develop a sales and distribution strategy to achieve the program's sales targets, particularly in rural areas.

Questioned Cost
0
Close Date
Sep 17, 2012
Recommendation
6

USAID/Haiti require Population Services International to evaluate whether its current sales strategies are increasing sales to populations in rural areas as intended.

Questioned Cost
0
Close Date
Sep 17, 2012
Recommendation
7

USAID/Haiti require Population Services International to develop a monitoring and evaluation process that can assess the impact of its interventions to date and allow PSI and USAID/Haiti to identify program gaps and areas where interventions are not achieving their intended outcome.

Questioned Cost
0
Close Date
Sep 17, 2012
Oct 06, 2011
Audit Report
4-632-12-001-P
Recommendation
1

USAID/Southern Africa develop and implement a plan to hold regular program coordination forums with its Lesotho implementing partners and provide written invitations to other U.S. Government agencies in Lesotho and their implementing partners to participate.

Questioned Cost
0
Close Date
Sep 20, 2012
Recommendation
2

USAID/Southern Africa determine whether Pact is currently achieving performance targets and document the results and develop and implement a plan to help enable Pact to achieve its targets if it is not doing so.

Questioned Cost
0
Close Date
Oct 06, 2011
Recommendation
3

USAID/Southern Africa develop and implement a gender strategy to require that its HIV/AIDS programming in Lesotho systematically address the President's Emergency Plan for AIDS Relief's gender-related goals.

Questioned Cost
0
Close Date
Sep 20, 2012
Recommendation
4

USAID/Southern Africa collaborate with the Centers for Disease Control and Prevention in Lesotho to put in place additional performance indicators and monitoring and evaluation tools that USAID officials can directly access to adequately measure whether John Snow Inc. is fulfilling the terms of its contract with USAID in Lesotho.

Questioned Cost
0
Close Date
Sep 20, 2012

2011

Nov 03, 2011
Audit Report
G-391-12-001-P
Recommendation
1

USAID/Pakistan develop and implement a plan with measurable targets to help ensure the mango activity achieves its contract goals.

Questioned Cost
0
Close Date
Nov 03, 2011
Recommendation
2

USAID/Pakistan develop and implement a performance management plan for the Firms Project that complies with USAID's Automated Directives System 203 and adjusts targets to reflect strategy shifts, delays, and current conditions.

Questioned Cost
0
Close Date
Mar 19, 2012
Recommendation
3

USAID/Pakistan develop procedures to collect and analyze indicator results periodically to measure progress toward planned results in accordance with USAID's Automated Directives System 203.

Questioned Cost
0
Close Date
Nov 03, 2011
Recommendation
4

USAID/Pakistan instruct Chemonics to exclude from project sales totals all procurements from local vendors.

Questioned Cost
0
Close Date
Nov 03, 2011
Recommendation
5

USAID/Pakistan determine the allowability of $1,359,337 in questioned costs (unsupported) and recover those costs determined to be unallowable.

Questioned Cost
1359337
Close Date
Feb 27, 2017
Recommendation
6

USAID/Pakistan verify that Chemonics has corrected all procurement deficiencies identified in this report.

Questioned Cost
0
Close Date
Mar 22, 2013
Recommendation
7

USAID/Pakistan develop and implement procedures to conduct site visits to ensure goods and services acquired under the Firms contract are maintained according with Agency property management standards and requirements.

Questioned Cost
0
Close Date
Nov 03, 2011
Recommendation
8

USAID/Pakistan reassess the project component devoted to improving the business-enabling environment and develop meaningful targets that align with Firms Project goals.

Questioned Cost
0
Close Date
Mar 19, 2012
Recommendation
9

USAID/Pakistan complete and file all delinquent and future past performance reports in accordance with federal and USAID policies and procedures.

Questioned Cost
0
Close Date
Nov 03, 2011
Sep 30, 2011
Audit Report
M-000-11-005-P
Recommendation
1

We recommend that the Millennium Challenge Corporation's Vice President for the Department of Compact Operations require FOMILENIO to develop a written contingency plan for Section 7 of the Northern Transnational Highway to ensure road completion.

Questioned Cost
0
Close Date
Apr 20, 2012
Recommendation
2

We recommend that the Millennium Challenge Corporation's Vice President for the Department of Policy and Evaluation, in conjunction with FOMILENIO, revise and document the revision of the following indicators:
-Number of beneficiaries of technical assistance and training
-Number of beneficiaries that have applied improved techniques
-Investment in productive chains by selected beneficiaries
-Increase in income of households near the Northern Transnational Highway
-Land prices along the Northern Transnational Highway
-Travel time from Guatemala to Honduras through the Northern Zone

Questioned Cost
0
Close Date
Apr 20, 2012
Recommendation
3

We recommend that the Millennium Challenge Corporation's Vice President for the Department of Policy and Evaluation, in conjunction with FOMILENIO, document the verification of reported data used for the following indicators:
-Number of farmers trained
-Number of beneficiaries that have applied improved techniques

Questioned Cost
0
Close Date
Apr 20, 2012
Recommendation
4

We recommend that the Millennium Challenge Corporation's Vice President for the Department of Policy and Evaluation, in conjunction with FOMILENIO, finalize and implement the Productive Development Project-specific Monitoring and Evaluation manual.

Questioned Cost
0
Close Date
Apr 20, 2012
Sep 29, 2011
Audit Report
F-306-11-004-P
Recommendation
1

USAID/Afghanistan, in collaboration with the
Ministry of Public Health, develop and implement a plan that (1) improves the nongovernmental organization contractors' supervision, monitoring, and problem solving at their health facilities; and (2) verifies the successful implementation of a reliable quality assurance mechanism by the nongovernmental organization contractors, including the establishment of quality assurance committees at each of the health
facilities.

Questioned Cost
0
Close Date
Jun 27, 2012
Recommendation
2

USAID/Afghanistan assist the Ministry of Public Health in establishing and implementing a plan to ensure that nongovernmental organization contractors are verifying that the requirement of second-person verification is being effectively implemented at health facilities.

Questioned Cost
0
Close Date
Jun 27, 2012
Recommendation
3

USAID/Afghanistan, in collaboration with the Ministry of Public Health, develop a plan to (1) identify a pool of qualified civil service employees who would benefit from capacity building training in order to sustain the ministry's capacity for managing the PCH program and (2) provide the training.

Questioned Cost
0
Close Date
Sep 21, 2012
Recommendation
4

USAID/Afghanistan work with the Ministry of Public Health and the Ministry of Finance to streamline the payment process to accelerate payments to nongovernmental organization contractors and health workers.

Questioned Cost
0
Close Date
Sep 30, 2012
Recommendation
5

USAID/Afghanistan work with the Ministry of
Public Health and the Ministry of Finance to (1) implement written policies and procedures that clearly define the roles, responsibilities, and approval authorities for the payment process and (2) provide further training on the advance/liquidation mode of payment process.

Questioned Cost
0
Close Date
Mar 07, 2013
Recommendation
6

USAID/Afghanistan work with the Ministry of Public Health and the Ministry of Finance to implement procedures limiting the frequency of changes made to the payment process and providing sufficient notification and clear instructions to nongovernmental organization contractors on any changes.

Questioned Cost
0
Close Date
Jun 25, 2013
Recommendation
7

USAID/Afghanistan review its internal administrative procedures, such as the processing of implementation letters, to ensure the smooth and timely flow of the payment process for on-budget assistance agreements.

Questioned Cost
0
Close Date
Sep 21, 2012
Recommendation
8

USAID/Afghanistan issue a mission order to provide an organizational framework with clearly defined roles and responsibilities of all mission offices responsible for managing on-budget assistance activities.

Questioned Cost
0
Close Date
Sep 21, 2012
Recommendation
9

USAID/Afghanistan provide a formal designation
letter similar to an officer's technical representative designation letter to staff members
monitoring implementation of on-budget assistance agreements.

Questioned Cost
0
Close Date
Sep 28, 2012
Recommendation
10

USAID/Afghanistan work with the Ministry of Public Health to prepare a performance management plan for the Partnership Contracts for Health Services program.

Questioned Cost
0
Close Date
May 11, 2012
Recommendation
11

USAID/Afghanistan provide the Ministry of Public Health with clearly written definitions of Afghan Info performance indicators.

Questioned Cost
0
Close Date
May 11, 2012
Recommendation
12

USAID/Afghanistan implement procedures to review and verify the accuracy of data entered into Afghan Info and provide timely feedback to users.

Questioned Cost
0
Close Date
May 11, 2012
Recommendation
13

USAID/Afghanistan, in collaboration with the Ministry of Public Health, implement a plan to confirm and document accurate GPS coordinates for the ministry's health facilities.

Questioned Cost
0
Close Date
Sep 21, 2012
Sep 28, 2011
Audit Report
6-294-11-009-P
Recommendation
1

USAID/West Bank and Gaza develop and implement a plan with milestones to establish management controls that require indicator data reported under the Palestinian Authority Capacity Enhancement Program to be accurate and reliable.

Questioned Cost
0
Close Date
Sep 26, 2012
Recommendation
2

USAID/West Bank and Gaza verify and correct in writing any errors in the reported baseline data for the Palestinian Authority Capacity Enhancement Program and document revisions in the mission's data tracking system.

Questioned Cost
0
Close Date
Sep 28, 2011
Recommendation
3

USAID/West Bank and Gaza require the implementer to obtain baseline data for the strategic communicaitons audit indicator for the Palestinian Authority Capacity Enhancement Program.

Questioned Cost
0
Close Date
Sep 26, 2012
Recommendation
4

USAID/West Bank and Gaza require the implementer to use a qualified, independent third party to score the strategic communicaitons audit indicator for the Palestinian Authority Capacity Enhancement Program.

Questioned Cost
0
Close Date
Sep 26, 2012
Recommendation
5

USAID/West Bank and Gaza restate the fiscal year 2010 targets in the mission's data tracking system so that indicators for the Palestinian Authority Capacity Enhancement Program are consistent with the program's data collection practices.

Questioned Cost
0
Close Date
Sep 28, 2011