Recommendation Dashboard

OIG makes recommendations in our reports to improve the efficiency and effectiveness of agency programs and help agencies identify questioned costs and funds that could be put to better use. The aim is to spur our audited agencies to take corrective actions, which allow us to close the recommendations.

This dashboard identifies current open recommendations along with the associated questioned costs.  Open recommendations may be resolved or unresolved:

  • A recommendation is resolved when OIG agrees with the agency's plan of action.
  • A recommendation is unresolved when the agency has yet to share a plan of action or OIG disagrees with the plan.

The dashboard below may not reflect accurate numbers due to temporarily unavailable resources. We apologize for any inconvenience. Please check back soon.

 

Total Open Recommendations (As of 3/6/25)

308

Open Financial Recommendations (As of 3/6/25)

$52,182,754


Please see an updated list of recommendations with their corresponding report below.

2011

Feb 14, 2011
Audit Report
7-680-11-004-P
Recommendation
1

USAID/Benin, in conjunction with Research Triangle Institute, identify alternative ways in which spray operators can tally results.

Questioned Cost
0
Close Date
Aug 31, 2011
Recommendation
2

USAID/Benin, in consultation with Research Triangle Institute, formulate clear definitions of terms and implement internal controls to ensure that consistent terminology is used in gathering and reporting data on indoor residual spraying with insecticide.

Questioned Cost
0
Close Date
Jun 27, 2011
Recommendation
3

USAID/Benin develop and implement procedures to validate insecticide-spraying data periodically through spot checks.

Questioned Cost
0
Close Date
Nov 28, 2011
Recommendation
4

USAID/Benin, through the Ministry of Health, strengthen controls to ensure that facilities' drug inventories and drug consumption are verified before drug requests are approved and delivered and mechanisms are in place to track drugs that are out of stock or will be out of stock to ensure timely replacement.

Questioned Cost
0
Close Date
Jan 31, 2012
Recommendation
5

USAID/Benin, through the Ministry of Health, take the appropriate steps to strengthen controls to ensure the proper storage of antimalarial drugs at all facilities.

Questioned Cost
0
Close Date
Mar 05, 2012
Recommendation
6

USAID/Benin communicate to the Ministry of Health the need to implement a plan to destroy the expired drugs currently in storage, and implement and effectively communicate to all affected health facilities a procedure for storage, pickup, and destruction of expired drugs.

Questioned Cost
0
Close Date
Sep 29, 2011
Recommendation
7

USAID/Benin require Research Triangle Institute to develop and implement procedures to improve inventory tracking processes, including training their logistics officers and warehouse managers on the best practices in inventory management.

Questioned Cost
0
Close Date
Aug 31, 2011
Recommendation
8

USAID/Benin require Research Triangle Institute to collaborate with the Ministry of Health to ensure distribution of the 8,112 nets that are stored in Research Triangle Institute's warehouse to regions where the nets are known to be more effective in preventing malaria.

Questioned Cost
0
Close Date
Feb 14, 2011
Recommendation
9

USAID/Benin's health team improve its monitoring of bed net distributions by increasing site visits to health facilities and bed net sales points, and developing a site visit template that specifically identifies areas to review during visits.

Questioned Cost
0
Close Date
Feb 14, 2011
Recommendation
10

USAID/Benin, in conjunction with its partners, develop and implement a uniform system for documenting and communicating cases of missing or diverted bed nets.

Questioned Cost
0
Close Date
Jun 27, 2011
Recommendation
11

USAID/Benin work with the Ministry of Health to develop a strategy for reinstating the Abomey regional hospital into the artemisinin-based combination therapy (ACT) treatments distribution network.

Questioned Cost
0
Close Date
Jun 27, 2011
Recommendation
12

USAID/Benin's health team update its performance management plan to include important malaria indicators.

Questioned Cost
0
Close Date
Mar 05, 2012
Recommendation
13

USAID/Benin update its agreements, work plans, and other documents with its implementing partners to require reporting on relevant malaria indicators and other performance measures.

Questioned Cost
0
Close Date
Mar 05, 2012
Feb 13, 2011
Audit Report
F-306-11-001-P
Recommendation
1

USAID/Afghanistan instruct New Mexico State University to conduct appropriate follow-up activities to determine the effectiveness of its technical assistance and training activities with the Ministry of Agriculture, Irrigation and Livestock and verify that appropriate follow-up has been performed.

Questioned Cost
0
Close Date
Oct 25, 2011
Recommendation
2

USAID/Afghanistan periodically verify the results reported by New Mexico State University for the Agriculture, Water, and Technology Transfer Program.

Questioned Cost
0
Close Date
Jun 13, 2011
Recommendation
3

USAID/Afghanistan provide New Mexico State University with written definitions of the performance indicators and discuss them with staff members periodically to ensure that the definitions are understood.

Questioned Cost
0
Close Date
Feb 13, 2011
Recommendation
4

USAID/Afghanistan require New Mexico State University to document challenges and implementation shortfalls in its quarterly reports.

Questioned Cost
0
Close Date
Jun 13, 2011
Recommendation
5

USAID/Afghanistan determine the acceptability of the branding and marking plan submitted by New Mexico State University, and after approving some version of the plan, verify its implementation.

Questioned Cost
0
Close Date
Jun 13, 2011
Recommendation
6

USAID/Afghanistan perform an environmental assessment for the program and implement any corrective actions that may be required.

Questioned Cost
0
Close Date
Jun 13, 2011
Feb 11, 2011
Audit Report
5-388-11-005-P
Recommendation
1

USAID/Bangladesh work with the implementing partner to develop an implementation plan for the completion of the media center by program end.

Questioned Cost
0
Close Date
Sep 14, 2011
Recommendation
2

USAID/Bangladesh provide written instructions to the implementing partner requiring the development of a sustainability plan for the media center that identifies possible funding sources and incorporate this plan into the work plan, budget, and performance management plan.

Questioned Cost
0
Close Date
Sep 14, 2011
Recommendation
3

USAID/Bangladesh review and document the feasibility of creating a fully functional parliamentary budget analysis and monitoring unit. If feasible, the mission should require the
implementing partner to develop an implementation plan which would include roles and responsibilities of all parties for the completion of the budget analysis and monitoring unit by program end and prepare a sustainability plan to continue the operations of the unit after the program ends. If not feasible, all funds related to establishing the unit should be reprogrammed for other activities.

Questioned Cost
0
Close Date
Sep 14, 2011
Recommendation
4

USAID/Bangladesh require the implementing partner to mark the media center with the USAID logo or submit a
written request to the mission for a waiver.

Questioned Cost
0
Close Date
Sep 14, 2011
Feb 04, 2011
Audit Report
7-681-11-003-P
Recommendation
1

USAID develop and implement a strategy to address Le Soutien's lack of performance and misuse of U.S.
Government funds.

Questioned Cost
0
Close Date
Feb 27, 2012
Recommendation
2

USAID make a final determination for the allowability of $708,080 of program expenses, which includes the costs of the motorbikes, desks, and scanner that have not been returned, and recover amounts determined to be disallowed.

Questioned Cost
708080
Close Date
Mar 31, 2014
Recommendation
3

USAID develop and implement a strategy to address Reseau Ivoirien des Organisations de Personnes Vivant avec le VIH (RIP Plus's) misconduct and misuse of U.S. Government funds.

Questioned Cost
0
Close Date
Feb 27, 2012
Recommendation
4

USAID settle and document any outstanding fees related to the financial audit of Reseau Ivoirien des Organisations de Personnes Vivant avec le VIH (RIP Plus) by the external auditors to obtain the audit report.

Questioned Cost
0
Close Date
Feb 27, 2012
Recommendation
5

USAID, in conjunction with Supply Chain Management System, review the inputs used to forecast demand to
ensure that drugs are available when needed.

Questioned Cost
0
Close Date
Jan 30, 2012
Recommendation
6

USAID, in conjunction with Supply Chain Management System, request the Government of Cote d'Ivoire, in writing, to communicate all changes in drug protocols to dispensing facilities in a timely manner to ensure that the right prescriptions are given to patients.

Questioned Cost
0
Close Date
Oct 31, 2011
Recommendation
7

USAID, in conjunction with Supply Chain Management System, upgrade or develop a mechanism in the Logistic Management Information System to track drugs that are out of stock or will be
out of stock to ensure timely replacement/reorders.

Questioned Cost
0
Close Date
Mar 28, 2012
Recommendation
8

USAID advise, in writing, the Government of Cote d'Ivoire's Ministry of Health of the need for greater accountability for the maintenance and disposition of U.S. Government procured drugs and request that the Ministry of Health provide USAID with copies of its supervision reports on physical inventory and status of U.S. Government drugs at health facilities for the duration of the project.

Questioned Cost
0
Close Date
Mar 28, 2012
Recommendation
9

USAID, in conjunction with Supply Chain Management System, work with the Ministry of Health to establish a plan and schedule for implementing quality control procedures for the distribution and handling of cotrimoxazole at service delivery sites to prevent future losses.

Questioned Cost
0
Close Date
Mar 28, 2012
Recommendation
10

USAID work with the Government of Cote d'Ivoire to develop and implement a plan to destroy the expired drugs currently in storage.

Questioned Cost
0
Close Date
Oct 31, 2011
Recommendation
11

USAID work with the Government of Cote d'Ivoire to develop and implement a policy for storage, pickup, and destruction of expired drugs and effectively communicate it to all health facilities affected.

Questioned Cost
0
Close Date
Mar 28, 2012
Recommendation
12

USAID improve the Logistics Management Information System to identify expiring drugs and implement a plan to use drugs before they expire to prevent waste.

Questioned Cost
0
Close Date
Mar 28, 2012
Recommendation
13

USAID work with the Government of Cote d'Ivoire to develop and implement a plan to address proper storage of HIV/AIDS drugs at all warehouses.

Questioned Cost
0
Close Date
Mar 28, 2012
Recommendation
14

USAID work with the University of North Carolina to implement the action plans developed as a result of the program assessment conducted in fiscal year 2008.

Questioned Cost
0
Close Date
Jan 30, 2012
Recommendation
15

USAID, in conjunction with John
Snow, Inc., work with the Ministry of Health to develop and implement a
monitoring plan, which includes communication with health districts, frequent site
visits, and prompt attention to problems to improve data use, analysis and
decision-making at the local level.

Questioned Cost
0
Close Date
Mar 28, 2012
Recommendation
16

USAID develop and implement a monitoring plan for PEPFAR activities in Cote d'[Ivoire that includes adequate resources to provide regular communication with users, frequent site visits, and prompt attention to problems to improve program implementation.

Questioned Cost
0
Close Date
Mar 28, 2012
Recommendation
17

USAID perform a data quality assessment of the results/reported data of the program.

Questioned Cost
0
Close Date
Mar 28, 2012
Recommendation
18

USAID, in coordination with the Centers for Disease Control and Prevention, establish and define roles and responsibilities for its PEPFAR staff.

Questioned Cost
0
Close Date
Oct 31, 2011
Recommendation
19

USAID verify and document that activities at the 35 sites not visited by the audit team are in fact active and that hospital participation is apparent.

Questioned Cost
0
Close Date
Oct 31, 2011
Jan 31, 2011
Audit Report
M-000-11-002-P
Recommendation
1

We recommend that the Millennium Challenge Corporation's Chief Executive Officer develop a detailed, written plan to establish strong project management capabilities for information technology projects, with sufficient responsibility, authority, and resources to apply disciplined practices. The plan must include assigning a certified project manager to information technology projects with the required minimum competencies based on project risk and complexity.

Questioned Cost
0
Close Date
Aug 01, 2011
Recommendation
2

We recommend that the Millennium Challenge Corporation's Chief Executive Officer develop written earned value management policies and procedures for information technology projects, as required by Office of Management and Budget memorandum M-05-23. At a minimum, this must include:
Performing surveillance reviews of the earned value management system.
Performing periodic compliance reviews of the earned value management system.
Establishing a performance baseline.
Conducting an integrated baseline review.

Questioned Cost
0
Close Date
Apr 10, 2012
Recommendation
3

We recommend that the Millennium Challenge Corporation's Chief Executive Officer develop written policies and procedures to plan for, mitigate, monitor, and report on risks to information technology projects.

Questioned Cost
0
Close Date
Jan 31, 2012
Recommendation
4

We recommend that the Millennium Challenge Corporation's Director of Contracts and Grants Management, in collaboration with the Chief Executive Officer, update the Contracts Operating Manual to include procedures for including risk management and earned value management in contracting actions, when required.

Questioned Cost
0
Close Date
Oct 31, 2011
Recommendation
5

We recommend that the Millennium Challenge Corporation's Chief Executive Officer develop written policies and procedures to obtain written approval for relying on a contractor's systems development life cycle methodology.

Questioned Cost
0
Close Date
Oct 25, 2011
Recommendation
6

We recommend that the Millennium Challenge Corporation's Chief Executive Officer develop written policies and procedures to address key decision points for information technology projects, including who is responsible for making those decisions and what information should be used as the basis for making those decisions.

Questioned Cost
0
Close Date
Oct 25, 2011
Recommendation
7

We recommend that the Millennium Challenge Corporation's Chief Executive Officer, establish in writing what documentation must be prepared, updated, and maintained for information technology projects based on size and complexity of the project. At a minimum, this must include:
Office of Management and Budget Exhibit 300s
Project charters
Earned value management reports
Risk management plans and reports
Requirements documents
Reports to senior management

Questioned Cost
0
Close Date
Oct 25, 2011
Recommendation
8

We recommend that the Millennium Challenge Corporation's Vice President for Compact Operations implement the following controls for the MCC Integrated Data Analysis System project before proceeding to the development phase to build additional functionality for the MCC Integrated Data Analysis System:
Risk management
Earned value management
Requirements management

Questioned Cost
0
Close Date
Oct 25, 2011
Recommendation
9

We recommend that the Millennium Challenge Corporation's Senior Assessment Board review the Corporation's information technology project management capabilities and prepare a written determination regarding whether its weaknesses should be reported, tracked, and monitored as a material weakness pursuant to the Federal Managers' Financial Integrity Act of 1982.

Questioned Cost
0
Close Date
Aug 25, 2011
Jan 27, 2011
Audit Report
4-656-11-005-P
Recommendation
1

USAID/Mozambique develop and implement a plan with milestones to provide training or technical assistance to appropriate staff at warehouse and health-care facilities that store and dispense USAID-funded antimalarial drugs and insecticide-treated bed nets so that staff are capable of properly maintaining inventory records and managing stocks effectively.

Questioned Cost
0
Close Date
Apr 26, 2011
Recommendation
2

USAID/Mozambique develop and implement a plan with milestones to train appropriate staff of the indoor residual spraying program to record data, maintain source documents, maintain data systems, and report program results properly.

Questioned Cost
0
Close Date
Jan 27, 2011
Recommendation
3

USAID/Mozambique establish and implement written procedures to ensure that program results reported by implementing partners in quarterly and annual reports are consistent with the mission's performance indicators and annual performance report.

Questioned Cost
0
Close Date
Jan 27, 2011
Recommendation
4

USAID/Mozambique provide training to mission staff on the requirements for data quality assessments outlined in the Automated Directives System and develop policies and procedures to make copies of data quality assessments easily accessible to mission staff and implementing partners.

Questioned Cost
0
Close Date
Jan 27, 2011
Recommendation
5

USAID/Mozambique develop and implement a schedule to conduct periodic site visits that entail data quality testing and verification, and document the results of those visits.

Questioned Cost
0
Close Date
Jan 27, 2011
Jan 26, 2011
Audit Report
1-514-11-002-P
Recommendation
1

USAID/Colombia define and develop its own indicator to determine progress achieved towards the main goal of stabilization or significant improvement in the quality of life of beneficiaries.

Questioned Cost
0
Close Date
Dec 28, 2011
Recommendation
2

USAID/Colombia, in coordination with its implementing partners, work with the Constitutional Court and the Government of Colombia to develop a Government of Colombia definition of an intermediate level of stabilization of displaced and vulnerable persons.

Questioned Cost
0
Close Date
Dec 28, 2011
Recommendation
3

USAID/Colombia develop a qualitative measure that captures improvements of the institutions receiving institutional strengthening and the impact.

Questioned Cost
0
Close Date
Dec 28, 2011
Recommendation
4

USAID/Colombia reevaluate income generation efforts to refocus program indicators and activities on income stabilization and incorporate characteristics specific to displaced and vulnerable populations.

Questioned Cost
0
Close Date
Dec 28, 2011
Recommendation
5

USAID/Colombia adjust its future performance plan and report to correct inaccuracies in any reported results in the Fiscal Year 2009 Performance Plan and Report.

Questioned Cost
0
Close Date
Dec 28, 2011
Jan 25, 2011
Audit Report
M-000-11-001-P
Recommendation
1

We recommend that the Millennium Challenge Corporation eliminate from the project the nine health centers that Medical Care Development International recommended decommissioning, whose renovation will cost an estimated $8 million, or justify in writing their continued inclusion in the project.

Questioned Cost
0
Close Date
Jan 25, 2011
Recommendation
2

We recommend that the Millennium Challenge Corporation follow-up on the Medical Care Development International report to determine whether the inclusion by default of the 20 health centers within the MCC project is warranted, and document its analysis and decision.

Questioned Cost
0
Close Date
Jan 25, 2011
Recommendation
3

We recommend that the Millennium Challenge Corporation reassess the decentralization efforts to determine whether the District Health Management Teams will be functional upon health center completion; document its efforts; and implement additional mitigation measures, if necessary, to manage the risk to sustainability.

Questioned Cost
0
Close Date
Jan 03, 2012
Recommendation
4

We recommend that the Millennium Challenge Corporation develop a policy requiring conditions precedent to focus on outcomes, where appropriate, rather than prescribing specific activities.

Questioned Cost
0
Close Date
Jan 25, 2011
Recommendation
5

We recommend that the Millennium Challenge Corporation review the annual budget of the Government of Lesotho to determine whether sufficient amounts were budgeted to cover its share of the cost of the health center renovations and document its review.

Questioned Cost
0
Close Date
Jan 03, 2012
Recommendation
6

We recommend that the Millennium Challenge Corporation develop and implement a strategy with the Millennium Challenge Corporation, Millennium Challenge Account-Lesotho, and the supervisory engineer to coordinate oversight during renovation of all health centers in the project.

Questioned Cost
0
Close Date
Jan 03, 2012
Recommendation
7

We recommend that the Millennium Challenge Corporation determine whether the health centers included in its project are complying with the memorandum of understanding establishing that all of the essential health services must be provided, and document its review. If centers are not complying, MCC needs to take appropriate action and document its rationale.

Questioned Cost
0
Close Date
Jan 03, 2012
Recommendation
8

We recommend that the Millennium Challenge Corporation review and document the role of private sector providers in compact implementation and establish a written policy for compliance with service delivery requirements to receive Millennium Challenge Corporation funding.

Questioned Cost
0
Close Date
Jan 25, 2011
Recommendation
9

We recommend that Millennium Challenge Corporation revise its Health Sector Project monitoring and evaluation plan to properly attribute the comprehensive efforts being provided by other donors.

Questioned Cost
0
Close Date
Jan 25, 2011
Recommendation
10

We recommend that the Millennium Challenge Corporation review its strategy for health systems strengthening, determine and document whether it will achieve its intended purpose, and take appropriate action and document its rationale if it will not.

Questioned Cost
0
Close Date
Jan 25, 2011
Recommendation
11

We recommend that the Millennium Challenge Corporation require that the Millennium Challenge Account-Lesotho develop a comprehensive, documented communications strategy to increase the transparency of its project activities and provide adequate and timely information to other donors and stakeholders for use in coordinating efforts.

Questioned Cost
0
Close Date
Jan 03, 2012
Jan 12, 2011
Audit Report
1-523-11-001-P
Recommendation
1

USAID/Mexico exert technical control over the contract and require Management Systems International to develop an implementation strategy that outlines how it intends to identify the sites where it intends to work and the methodologies it intends to deploy for identifying the training needs and execution of training.

Questioned Cost
0
Close Date
Aug 11, 2011
Recommendation
2

USAID/Mexico conduct a portfolio review to examine the strategic and operational issues and determine whether USAID-supported activities are supporting the implementation of criminal justice reforms at the federal and state levels and strengthening civil society organizations' promotion and oversight of human rights.

Questioned Cost
0
Close Date
Jul 21, 2011
Recommendation
3

USAID/Mexico either re-compete the contract for technical services or prepare the appropriate justification required by the Competition in Contracting Act of 1984 for other than full and open competition.

According to RIG/SS's 6/9/11 memo, rec. was subsequently revised within the final report to:

Mission seek an independent technical decision from either the Contract Review Board or the USAID Ombudsman to make a determination if USAID complied with the Federal Acquisition Regulations in approving the award of the MSI task order under the ENGAGE IQC.

Questioned Cost
0
Close Date
Aug 11, 2011
Recommendation
4

USAID/Mexico revise its current performance indicators and associated targets for the rule of law program so that they will assess progress toward the program's overall goals and objectives.

Questioned Cost
0
Close Date
Aug 11, 2011
Recommendation
5

USAID/Mexico update its Performance Management Plan for the rule of law program.

Questioned Cost
0
Close Date
Aug 11, 2011
Recommendation
6

USAID/Mexico strengthen its internal controls so that technical officers implement their delegated duties in accordance with USAID policy.

Questioned Cost
0
Close Date
Aug 11, 2011
Recommendation
7

USAID/Mexico establish procedures for systematically following up with training participants to assess the impact and effectiveness of training.

Questioned Cost
0
Close Date
Aug 11, 2011
Recommendation
8

USAID/Mexico institute procedures to consistently collect and input training data into the USAID training network.

Questioned Cost
0
Close Date
Jul 21, 2011
Jan 12, 2011
Audit Report
M-000-11-001-S
Recommendation
1

We recommend the the Millennium Challenge Corporation's Vice President of Compact Operations revise the guidance on Standard Bidding Documents: Procurement of Small Works to include specific trafficking in persons provisions.

Questioned Cost
0
Close Date
Dec 20, 2011